• Automobile Air Braking System Testing Equipment, for Air Compressor, Air Braking Valves
  • Automobile Air Braking System Testing Equipment, for Air Compressor, Air Braking Valves
  • Automobile Air Braking System Testing Equipment, for Air Compressor, Air Braking Valves
  • Automobile Air Braking System Testing Equipment, for Air Compressor, Air Braking Valves
  • Automobile Air Braking System Testing Equipment, for Air Compressor, Air Braking Valves
  • Automobile Air Braking System Testing Equipment, for Air Compressor, Air Braking Valves

Automobile Air Braking System Testing Equipment, for Air Compressor, Air Braking Valves

Testing Equipment Type: Car Fault Detector
Certification: ISO
Update Method: by Hard Disk
Condition: New
Standard: Standard
Power: 380V 50Hz
Customization:
Gold Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
QYZ-2
Motor Power
5.5kw
Transport Package
Plywood Case
Specification
ISO9001
Trademark
Haolida
Origin
Qingdao China
HS Code
9301200090
Production Capacity
100 Sets Per Month

Product Description

                       QYZ-2 model Automobile Air Braking System Testing Equipment, for air compressor,air braking valves
 
General introduction:
This air braking system test bench is used mainly for testing performance of air compressor, master valve, air chamber, quick release valve and four-circuit valve in brake system of high, medium and low models automobiles at home and abroad and carrying out double-chamber or three-chamber test of master valve.
 
Advantages:
1.      It is with indicator lamp following each step and warn you the problems.
2.      It possesses high control sensitivity and strong controllability.
3.      It is easy to learn and operate.
4.      It can be matched with PLC computer to operate, display, save & print test results and curves.
 
Test items:
Air compressor: The time required by air compressor to reach specified pressure value when air compressor runs at rated RPM.
Master valve: the required time of inflating air from main tank into air chamber through master valve (the time through air);
Air chamber: after air is inflated from main tank into air chamber to reach set pressure value, hold the pressure.
Quick release valve: after air is inflated from main tank into sub-tank through quick release valve to reach set pressure value, hold the pressure.
Four-circuit valve: the same with test of quick release valve.
Relay valve: test its on-off and air impermeability.
Differential valve: test its on-off and air impermeability.
Test the magnetic valve performance in air braking system.
 
Technical parameter:
 
Model no QYZ-2
Language English
Material Metal plate
Painting Powder painting, durable and beautiful
Color Blue
Voltage 380V 50 Hz 3P (other voltage acceptable)
Motor power 11KW
Frequency converter power 11KW

Variable frequency speed regulating range no load 0-5000r/min
load 0-2000r/min(continuously adjustable)
Volume of main air tank 20L*2
Auxiliary tank of air pump 15L
External air source 1Mpa
Air passing time 0-99.999s
Rated pressure of lubrication oil pump 0-1.0Mpa (adjustable continuously)
Over load protection function Yes
Accessories:
Accessory wires, etc.
Others you may want to know:
MOQ 1set
Warranty period 12 months
Payment term T/T 50% in advance, the balance should be paid before delivery  (negotiable)
Delivery time 35 days after receiving downpayment
HS code 90312000.90
Packing sizes 1700*950*1680=2.71CBM
1040*745*1330=1.03CBM
Total:3.74CBM
 
 
Why Choose us:
1.      32 years' design,development and produce experience
2.      Professional R&D team
3.      Strict QC
4.      A good pre-sale and after-sale service
5.      Can design and make according to customer's requests

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
31
Year of Establishment
2003-04-10